MR · Baltic ice series
Built 2006–2010 in South Korea
- Deadweight
- 47,400 t
- Ice class
- 1B
- Design speed
- 14.6 kn
- Fuel at sea
- 30.9 t a day
From
$8,261,000
Tankers of the former shadow fleet, returned to legal trade: repaired, back in class and handed over ready to work. Choose a class, then a series of sister ships, then the tanker itself.
Built 2006–2010 in South Korea
From
$8,261,000
Built 2002–2008 in Japan
From
$7,384,000
Built 2004–2009 in South Korea
From
$10,743,000
Built 2008–2011 in South Korea
From
$11,817,000
Built 2004–2009 in South Korea
From
$13,200,000
Built 2000–2005 in Japan
From
$12,035,000
Built 2008–2012 in China
From
$14,857,000
Built 2001–2006 in South Korea
From
$18,056,000
Built 2007–2011 in South Korea
From
$20,733,000
Built 2000–2004 in Japan
From
$29,994,000
Built 2003–2008 in South Korea
From
$33,665,000
Built 2008–2012 in China
From
$35,146,000
Typical figures for tankers of this class; fuel at sea covers the main engine, generators and boilers.
Every tanker has its own request button on its series page. A request costs nothing: you pay only after the desk confirms the price.
Every line adds up to what you pay for a ship ready to trade.
Scrap price now: $520 per LDT, from GMS weekly ship recycling indications, tankers, Pakistan, 3 Nov 2026. When it moves, so do our prices.
On 19 October 2026 the US Energy Secretary, Chris Wright, said investors may buy idle sanctioned tankers, repair them and carry oil that is not under sanctions. “There is no removing of sanctions”, he said: each ship goes through approval, its designation comes off when it is sold to a new owner, and the old owner stays sanctioned.
Wright put the shadow fleet at about 1,600 tankers and said dozens or even hundreds could come back. Analysts count fewer: Kpler expects only 24 of some 160 sanctioned VLCCs to return to mainstream trade.
On 28 October 2026 OFAC published a Statement of Licensing Policy on Authorizing Persons to Purchase Blocked Vessels. It is not a general licence: buyers apply, and OFAC decides ship by ship.
OFAC, Russia-related sanctions: guidance on licensing policy · PortNews
Many of these ships need work. Clarksons understands that about half of the sanctioned VLCCs are storing cargo, idle or damaged, and that bringing them back takes lengthy repairs and upgrades.
OFAC has licensed such purchases before, one ship at a time: earlier in 2026 it gave the ship recycler GMS specific licences to buy and recycle four sanctioned container ships.
Our terms, not OFAC's rules: you pay into the desk's escrow account, and every tanker is repaired and back in class before we hand it over.
The ships and the desk are fictional. A real purchase of a blocked vessel needs a licence from OFAC.